2021 Pavement Rehab Project

The work includes, but is not limited to:a. Concrete work to remove and replace curb and gutter, curb ramps and sidewalk;b. Cold planing and wedge grinding existing street surfaces;c. Asphalt dig-outs and patch paving;d. Placement of Rubberized Hot Mix Asphalt (RHMA) and Hot Mix Asphalt (HMA);e. Placement of Type II (Black Rock) Slurry Seal;f. Adjusting existing boxes and manholes to grade;g. Pavement striping, markings, and markers;h. Replacement traffic loop detectors;i. Traffic control; andj. Incidentals necessary to complete all appurtenant work in place, to be ready for public use, as shown in these Special Provisions and other Contract Documents to which reference is hereby made.

Status

Bidding Closed

Bid Date4/27/21 2:00 pm

Company & Contacts

City of Benicia

Danny Urrutia   707-746-4374

Location

Benicia, CA

Engineer’s Opinion of Probable Cost

The Engineer’s Opinion of Probable cost for the base bid and all additive bid items is between $4,500,000 and $5,000,000.