Water Treatment Plant Utility Water System Improvement

The work consists of the removal and disposal of two existing hydropneumatic and two compressed air tanks and the procurement and installation of a package pump station. This includes the installation of four vertical multistage pumps and motors, one hydropneumatic tank, discharge piping, suction piping, VFDs, instrumentation, valves, fittings, and all appurtenances. This installation includes the procurement and installation of the necessary site electrical system as shown on the plans, including conduit and wiring to the package pump station.
  Plans (click to expand/collapse)
Name Size
Plans 6.8 MB