Southern Pacific Depot Freight Room Renovation
The work consists of the installation of accessible parking and concrete path of travel, ADA concrete ramp, accessible doors. An accessible rest room, plumbing, electrical, flooring, painting interior and exterior, dry wall and lighting.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Addendum 1 sp depot | 358.3 KB | |||
bid schedule sp depot | 1.4 MB |