Public Jobs

Bidding Closed
5/20/22 2:00pm
East E St Parking Lot Improvements
Bidding Closed
City of Benicia
Benicia, CA
Bidding Closed
5/11/22 2:00pm
Fitzgerald Field Bleacher Replacement Project
Bidding Closed
City of Benicia
Benicia, CA
The work consists of the removal and replacement of the bleachers at Fitzgerald Field, work includes electrical, plumbing, concrete and asphalt paving new bleachers as well as restroom.
Bidding Closed
3/28/22 2:00pm
Citywide Micro-surfacing Project 2022
Bidding Closed
City of Benicia
Benicia, CA
Bidding Closed
3/14/22 2:00pm
Raw Water Line Repair Project
Bidding Closed
City of Benicia
4900 Fulton Dr, Fairfield, CA
The City of Benicia’s Public Works Department is seeking an underground construction company to help with the excavation of the City’s Raw Water Line, and installation of a full-circle pipe clamp to affect repairs on a leaking section of the pipe. The pipe is 24-inch diameter steel and is encased in concrete. It is estimated to be 8 feet deep and is located in undeveloped open space in Fairfield, CA. The City of Benicia will provide the contractor with a repair clamp to complete the repair work to the Raw Water Line. Work shall be completed within 14 days from the date the Notice of Proceed is issued. The estimated cost of construction for the project is $20,000.
Bidding Closed
10/18/21 2:00pm
Water Treatment Plant Tank Rehab 21-02
Bidding Closed
City of Benicia
Benicia, CA
The scope of work generally consists of the necessary preparations and subsequent installation of three (3) new polypropylene tanks at the Water Treatment Plant, Chemical Tank Farm. Minor electrical, PVC piping and concrete surface rehabilitation are required to complete the installation. All used tanks will be required to be removed from the facility and properly disposed. The project consists of two main phase. Phase 1 includes the installation and successful start up of two Sodium Hydroxide Tanks. Phase 2 includes the removal and installation of an Alum Tank seismic upgrades to three existing tanks. Work associated with Phase 1 shall be completed within 14 Days from the date when Contract Time commences to run as specified in the initial Notice to Proceed. A second Notice to Proceed will be issued for the Phase 2. Work associated with Phase 2 shall be completed within 21 Days from the date when Contract Time commences to run as specified in the Phase II Notice to Proceed. The second Notice to Proceed shall be issued no later than 90 days from the first Notice to Proceed. The estimated cost of construction for the project is $145,000.